Maryam Nawaz Infrastructure Programs: Punjab’s infrastructure landscape is undergoing a historic transformation under the leadership of Chief Minister Maryam Nawaz Sharif. The Maryam Nawaz all scheme list for infrastructure development covers over Rs1,240 billion in development spending, more than 12,000 kilometers of rehabilitated roads, and groundbreaking projects like the Sarkain Bahal Punjab Khushal program, the SL-3 and SL-4 Ring Road corridors, the Tourist Glass Train, and targeted district packages for Kasur, Hafizabad, and Murree.
What you will learn from Maryam Nawaz Infrastructure Programs guide:
- The complete list of Maryam Nawaz infrastructure schemes with budgets and timelines
- Real-time progress updates on the Sarkain Bahal Punjab Khushal program
- SL-3 Ring Road completion status and SL-4 approval details
- Tourist Glass Train route, fare, and launch timeline
- District-wise development packages for Kasur, Hafizabad, Murree, and more
- Official application portals and how to access scheme benefits
Key Takeaways
- Record Development Budget: Punjab’s Rs1,240 billion development budget is the largest in the province’s history, fueling road rehabilitation and urban renewal at an unprecedented scale.
- 12,000+ Kilometers Rehabilitated: The Sarkain Bahal Punjab Khushal program has already rehabilitated or constructed over 12,000 kilometers of roads, with work actively underway on 462 highways across Punjab.
- Glass Train Moving Forward: The Murree Glass Train project has secured PC-I approval, with bidding scheduled for March and an extended route now planned from Islamabad Airport to Muzaffarabad.
- 7,500 Model Villages Coming: Phase-II of the Model Village Project will transform 7,500 rural settlements with water supply, drainage, and solar-powered tube wells, building on 485 villages already in progress.
- SL-4 Ring Road Approved: Following SL-3’s completion, Chief Minister Maryam Nawaz has formally approved the SL-4 corridor from Maraka to Sharqpur, with a firm June 30 deadline for accelerated progress.
- Read More: Deceased Care Service Punjab | سرکاری ہسپتال سے گھر تک میت منتقلی سروس
- Read More: Wheat Price In Pakistan | 100Kg Wheat Price In Pakistan
- Read More: 50 Kg Wheat Price In Pakistan Today -Gandum Rates Today
- Read More: Gandum Rate in Pakistan – Govt Wheat Rate Per 40 kg
Maryam Nawaz All Scheme List – (Infrastructure Programs) | Maryam Nawaz Infrastructure Programs

Table Of Contents
1. Sarkain Bahal Punjab Khushal: The Flagship Road Rehabilitation Program

What exactly is the Sarkain Bahal Punjab Khushal project by Maryam Nawaz? The Sarkain Bahal Punjab Khushal (Rehabilitated Roads, Prosperous Punjab) program is the Punjab government’s signature road infrastructure initiative. It carries a total cost of Rs100 billion, with Rs50 billion allocated for the first phase alone. The program is designed to repair, rehabilitate, and construct thousands of kilometers of roads across both urban and rural Punjab, ensuring smoother transport, better connectivity, and economic uplift for millions of residents.
1.1 What is the total budget allocation for Sarkain Bahal Punjab Khushal?
The budget for Sarkain Bahal Punjab Khushal reflects the scale of Punjab’s infrastructure ambition. The Government of Punjab has formally approved the program with a total cost of Rs100 billion, including an initial allocation of Rs50 billion for the first phase. This marks one of the largest single-purpose road infrastructure investments in Punjab’s history.
Key budget distribution details across districts:
- Bahawalpur: Rs5.75 billion approved for 86 development schemes covering 183 kilometers of roads
- Sialkot: Rs4.85 billion launched for rural road construction and rehabilitation
- Gujrat: Rs485 million allocated per constituency under the program
- Sahiwal: Rs10 million completed for road carpeting at Khokha Bazaar
District Coordination Committees identify schemes locally, while Deputy Commissioners forward proposals to the Highway Division for technical evaluation. Only projects with full funding are initiated, and every scheme must be completed within the current financial year.
1.2 What is the progress and completion status of road rehabilitation work?

The Sarkain Bahal Punjab Khushal program is advancing at remarkable speed. As of the latest progress reviews, work is actively underway on 462 roads across Punjab. The breakdown of completion milestones shows:
- 25% completion achieved on 182 highways
- 50% completion achieved on 168 highways
- 75% completion achieved on 67 highways
The field teams of the Communication & Works Department continue to work diligently, with strict monitoring of high-quality materials to ensure timely and efficient project completion. The program has already achieved 24% overall completion, with 1,558 kilometers of earthwork completed, 1,434 kilometers of base work finished, and surfacing work completed on 296 kilometers.
The Chief Minister has further approved the installation of electric weighing machines on roads for the Excel Load Management System, ensuring that newly rehabilitated roads remain durable and protected from overloading damage.
1.3 Which districts are included in the Sarkain Bahal Punjab Khushal scheme?

The Sarkain Bahal Punjab Khushal program covers all districts across Punjab, with active projects in multiple regions simultaneously. Recent expansions include:
- Rawalpindi and Chakwal: 71 road projects launched for construction, repair, and widening
- Gujrat: 51 roads currently under construction and rehabilitation
- Hafizabad: 25-kilometer road linking Hafizabad to Khanqah Dogran connected with M-2 Motorway
Officials state that approximately 4,500 vehicles will benefit daily from improved connectivity and smoother travel in the Hafizabad corridor alone. The program aims to enhance regional mobility, reduce travel time, and strengthen inter-city access for commuters and transporters across the province.
1.4 What technologies and construction methods are being used in road rehabilitation?
The Sarkain Bahal program deploys advanced road construction technologies to ensure durability and long-term performance. Roads measuring less than 2 kilometers are being completely restored, while longer roads are being widened up to twelve feet or according to standard requirements.
Construction technologies being utilized:
- TST (Tack Seal Treatment) technology for road upgrading on 30 roads in Bahawalpur
- Full carpeting for 56 roads to ensure smooth, durable, and efficient traffic flow
- Modern base work techniques with strict quality control measures
The Highways Division ensures that all construction meets modern standards for durability and safety. Drainage improvements are incorporated alongside road construction to prevent water logging and road deterioration, extending the lifespan of the newly built infrastructure.
1.5 How will the Sarkain Bahal Punjab Khushal program benefit the common people?

The enhanced infrastructure delivers tangible benefits to ordinary citizens across Punjab. Safer, smoother, and more reliable road networks reduce travel time, lower vehicle maintenance costs, and improve access to markets, schools, and healthcare facilities.
Economic impact highlights:
- Improved connectivity facilitates faster movement of goods between districts
- Reduced transportation costs benefit businesses and consumers alike
- Rural areas gain better access to urban markets for agricultural products
- The program projects to benefit 50,000 families through direct and indirect employment
The initiative aims at improving connectivity, trade transport, and daily mobility across all districts. The flagship slogan “Sarkain Bahal, Punjab Khushhal” (Roads Restored, Prosperous Punjab) captures the program’s core mission of transforming Punjab’s road network from pothole-ridden pathways to modern, durable highways.
2. SL-3 Ring Road Southern Loop: Lahore’s Critical Transportation Artery

What is the SL-3 Ring Road Southern Loop project and why is it important? The Lahore Ring Road Southern Loop 3 (SL-3) is a vital infrastructure corridor extending from Raiwind Road to Multan Road, passing through Bahria Town and NFC-II, and connecting to a newly constructed interchange on Multan Road. The project has finally been opened to motorists after a lengthy hiatus spanning 12 years, marking a significant milestone in transportation infrastructure development for the Lahore region.
2.1 When was the SL-3 Ring Road Southern Loop completed?
The SL-3 Ring Road Southern Loop was completed and opened to the public in early 2024. After years of stalled progress and court battles, the Lahore Ring Road Authority, working with the Frontier Works Organisation, successfully delivered the project at a cost of approximately Rs16.5 billion. The Southern Loop-3 now serves as a critical connection between Raiwind Road and Multan Road, providing much-needed relief to Lahore’s congested transportation network.
Chief Minister Maryam Nawaz has continued to oversee post-completion improvements and has directed authorities to ensure early completion of remaining ancillary work. During a surprise visit to the site, she also announced plans for the Southern Loop-4 (SL-4) and directed necessary steps for its construction.
2.2 What is the route and scope of the Southern Loop-3 project?
SL-3 starts from Raiwind Road in Lahore (near Adda Plot) and ends at Multan Road (Maraka). It passes through Bahria Town, NFC Phase-II, and ends at an interchange constructed on Multan Road. The project spans approximately 18.5 kilometers of road infrastructure and includes:
- Two large interchanges
- A number of flyovers
- Service-road bridges and subways
- 14 drainage canals
The completion of SL-3 has markedly improved accessibility to various parts of Lahore. Residents of areas such as Bahria Town, NFC Phase 2, and New Lahore City now experience reduced travel times and streamlined commutes. The project was inaugurated with a one-month toll tax waiver, allowing citizens to travel for free during the initial operational period.
2.3 What is the status of SL-4 and future Ring Road expansions?
Following the successful completion of SL-3, Chief Minister Maryam Nawaz has formally approved the construction of SL-4. The new corridor will span approximately 18 kilometers, starting from Multan Road (Maraka) and extending to Sharqpur Interchange M3. The estimated cost exceeds Rs45 billion.
Key features of SL-4:
- Multiple interchanges and toll plazas
- A bridge over the River Ravi
- Land acquisition underway with a working group formed to expedite progress
- SL-4 will be linked to SL-3, creating a seamless Ring Road network
The Chief Minister has set a firm deadline of June 30 for accelerated progress on road projects, demanding weekly progress reports to ensure timely completion. Officials state that distances that earlier took hours will now be covered in minutes courtesy of SL-4, with the project expected to improve living standards for residents of Sharaqpur and surrounding areas.
2.4 How does the Ring Road project benefit Lahore’s traffic situation?
The complete Ring Road network provides an alternative route for traffic moving between different parts of Lahore, bypassing congested city center roads. SL-3 specifically serves the southern suburbs, providing faster access to Multan Road and Raiwind Road. SL-4 will further extend this connectivity to Sharaqpur and beyond.
Traffic improvement metrics:
- Reduced travel time for commuters in southern Lahore suburbs
- Lower fuel consumption and vehicle wear-and-tear
- Improved access for emergency services and freight transport
- Decongestion of city center roads as traffic diverts to the Ring Road
The Chief Minister has also directed the construction of underpasses and overhead bridges at railway crossings across Punjab. These measures, combined with the Controlled Access Corridor Bund Road project and Ravi Bridge expansion, work in conjunction with the Ring Road to create a comprehensive traffic management system for Lahore.
3. Ravi Bridge Upgradation: Expanding Connectivity Across the Ravi River
What is the Ravi Bridge Upgradation project launched by Maryam Nawaz? The Ravi Bridge Expansion Project includes the construction of a new 540-meter, four-lane bridge over the Ravi River, significantly expanding capacity and easing traffic flow between Lahore’s northern and southern districts. The project was formally launched alongside the Controlled Access Corridor Bund Road Package-II in September 2024 and has now been completed and opened to traffic.
3.1 What is the scope and scale of the Ravi Bridge expansion?
The Ravi Bridge expansion project is a comprehensive infrastructure initiative that delivers immediate benefits to commuters. The centerpiece is a 540-meter long, four-lane bridge over the Ravi River, operating alongside existing infrastructure to provide additional traffic capacity.
Project components:
- Remodeling of Babu Sabu Interchange at the main entrance and exit of the Controlled Access Corridor Project
- Construction of subways for vehicles and pedestrians
- Development of a greenbelt and park at Babu Sabu Chowk
- Removal of encroachments on valuable land
The project was completed after having faced inordinate delays under previous administrations. Although the foundation stone had been laid earlier, the project was only completed after Maryam Nawaz took office and prioritized its execution.
3.2 Which areas will benefit from the upgraded Ravi Bridge?
The expanded Ravi Bridge provides a vital link between Lahore and neighboring districts, offering significant benefits to multiple localities.
Benefiting areas:
- Shahdara
- Kot Abdul Malik
- Sheikhupura
- Kala Shah Kaku
- Lahore Ring Road
- Adjacent localities
The project reduces travel time for commuters traveling between Lahore’s northern and southern districts, facilitates freight movement, and improves access to industrial areas and business parks in the region. The connection between the Ravi Bridge project and the Controlled Access Corridor creates a seamless transportation corridor that improves traffic flow across northern Lahore.
3.3 What further improvements are planned for the Ravi Bridge corridor?
Chief Minister Maryam Nawaz has directed the expansion of the service lane along the Controlled Access Corridor to further improve traffic flow and accessibility. Additionally, she has ordered acceleration of development work in Ravi City, emphasizing the timely completion of ongoing projects in the broader Ravi River region.
The service lane expansion will provide additional capacity for local traffic, reducing congestion on the main corridor and improving access for residents and businesses in adjacent areas.
4. Tourist Glass Train: Punjab’s Revolutionary Scenic Rail Service
What is the Tourist Glass Train project announced by Maryam Nawaz? The Tourist Glass Train is a revolutionary scenic rail service being developed by the Punjab government, featuring glass-paneled electric trains that will operate on a 40-kilometer route from Lake View Park in Islamabad to Murree Bus Stand, covering the journey in just 40 minutes. The project has secured PC-I approval, with bidding for the monorail component scheduled for March and an extended route now planned from Islamabad Airport to Muzaffarabad.
4.1 What is the route and fare structure for the Murree Glass Train?
The Murree Glass Train route and fare structure have been finalized to make the service accessible to a wide range of tourists. The train will run from Lake View Park in Islamabad to Murree Bus Stop, with stations constructed at:
- Lake View Park, Islamabad
- Chattar Park
- Ghoda Gali
- Near Murree Bus Stop
Ticket fare categories:
- Standard ticket: Rs500
- Premium ticket: Rs1,000
This tiered pricing structure ensures accessibility while offering premium options for those seeking enhanced comfort. The provincial government has already received approval for the PC-I of the project, with the Engineering Procurement and Construction (EPC) procurement process scheduled to begin in December and the bid submission date set for March.
4.2 What is the current progress of the Glass Train project?
The Murree Glass Train project has made significant progress toward launch. The 40-kilometer route from Lake View Park to Murree Bus Stand has been finalized, and an agreement has been reached in principle to extend the project from Islamabad Airport to Muzaffarabad.
Project milestones achieved:
- PC-I approval received in November
- EPC procurement process scheduled to begin in December
- Bid submission date set for March
- Bidding for the monorail component opens in March
The Murree Development Plan, approved by Chief Minister Maryam Nawaz and PML-N President Nawaz Sharif, includes the glass train as a centerpiece of the largest development package in Murree’s history. The train will be electric and environmentally friendly, reducing reliance on vehicles and helping reduce pollution in the scenic hill station.
4.3 How will the Glass Train boost tourism in Murree and Punjab?
The introduction of the glass train is expected to transform tourism in Murree and surrounding areas. Tourists will get a closer view of breathtaking hilly landscapes, forests, and seasonal scenery along the route, making it a unique travel experience.
Tourism and economic benefits:
- Reduced traffic congestion on Murree’s roads, especially during peak tourist days
- Eco-friendly initiative with electric trains reducing vehicular pollution
- Boost to local businesses, hotels, and restaurants
- Enhanced visitor experience through modern, comfortable transport
The Murree Development Plan also includes a sky glass bridge for tourists, an eco-friendly glamping pod village, a resort, and Punjab’s first modern paragliding centre in Kotli Sattian. A dedicated tourism force has been established to enhance the visitor experience, and a chairlift project has also been approved.
5. 43 Development Schemes for Kasur: Targeted Infrastructure Growth
What are the 43 development schemes for Kasur under Maryam Nawaz? The 43 Development Schemes for Kasur represent a comprehensive package of targeted infrastructure growth initiatives for Kasur district, including industrial worker housing at the Workers Welfare Complex in Sundar Industrial Estate, technology park feasibility studies, garment city development, and innovative mobile learning projects. These schemes are part of Maryam Nawaz’s broader commitment to equitable development across all districts of Punjab.
5.1 What specific development schemes are included in the Kasur package?
The Kasur development package includes multiple major initiatives across housing, industry, education, and technology sectors.
Key projects approved for Kasur district:
- Allocation of 1,220 flats for industrial workers in Labor Complexes located in Sundar, Kasur, and Taxila
- Applications being accepted for 750 residential units at the Workers Welfare Complex in Sundar Industrial Estate, Kasur (Phase-I)
- Feasibility study approved for a 300-acre industrial and technology park in Narowal
- Technology university approved for Kasur
- ‘Garment Cities’ project with Kasur included in this industrial revolution initiative
Educational innovations:
- “School on Wheels” mobile learning project inaugurated
- “Library on Wheels” mobile project inaugurated
- Solar-powered e-rickshaws equipped with folding chairs and solar roofs deliver lessons and books to rural and urban areas
The mobile learning programs bring education directly to students who might otherwise lack access, representing an innovative approach to educational infrastructure.
5.2 How is the Kasur development package being implemented?
The Kasur development package is being implemented through coordinated efforts between multiple government departments and the Punjab Development Programme. The Workers Welfare Complex flats are being allocated through a ballot process, with Phase-I currently accepting applications for 750 units.
The garment cities project has a deadline for completion, while other schemes are at various stages of planning and implementation. The overall development package is integrated into the broader Punjab Development Programme, which includes the construction and development of 189 cities across the province in collaboration with international financial institutions including the World Bank and the Asian Development Bank.
5.3 How does Kasur fit into Maryam Nawaz’s broader district development strategy?
Kasur is one of several districts receiving targeted development packages under Maryam Nawaz’s administration. The 43 schemes for Kasur reflect a commitment to ensuring that no district is left behind in Punjab’s development journey.
The Model Village Program has approved development schemes for 414 villages across Punjab, including Kasur. The Punjab Development Programme includes the construction and development of 189 cities across the province, with Kasur as a key beneficiary.
Other districts receiving significant development packages include Bahawalpur (Rs5.75 billion for 86 schemes covering 183 km of roads), Sialkot (Rs4.85 billion for rural roads), Gujrat (Rs485 million per constituency), and Murree (multi-billion-rupee development package).
6. Motorway Interchange Sheikhupura: New Gateway to Economic Growth
What is the Motorway Interchange Sheikhupura project announced by Maryam Nawaz? The Motorway Interchange Sheikhupura is a new access point being constructed at the entrance of Quaid-e-Azam Business Park on the M2 Motorway. The project includes the upgradation, construction, and maintenance of border outposts along the interchange and is part of a broader infrastructure development strategy centered around the business park.
6.1 What is the location and scope of the Sheikhupura Motorway Interchange?
The Sheikhupura Motorway Interchange will be built at the entrance of Quaid-e-Azam Business Park on the M2 Motorway. The project scope includes:
- Upgradation, construction, and maintenance of border outposts along the M2 Motorway Interchange
- Construction of Garment City Plug and Play at Quaid-e-Azam Business Park
- Massive tree plantation drive within the business park premises
- Flyover at Chanda Qila Chowk in Gujranwala
Chief Minister Maryam Nawaz has directed the relevant departments to commence construction of the motorway interchange to facilitate easier access to the business park.
6.2 How will the interchange benefit Quaid-e-Azam Business Park and the local economy?
The new interchange will significantly improve accessibility to Quaid-e-Azam Business Park, making it more attractive to potential investors and workers. Better connectivity reduces transportation costs, improves supply chain efficiency, and makes the park a more competitive location for industrial and commercial activities.
Chief Minister Maryam Nawaz has approved the construction of Garment City Plug and Play at the business park, a strategic move aimed at making Punjab a hub for the apparel industry. This initiative is expected to create significant employment opportunities and boost exports.
The combination of the motorway interchange, Garment City, and associated infrastructure projects is expected to create fresh employment opportunities, attract foreign investment, and stimulate economic growth in Sheikhupura and surrounding areas.
7. Murree Development Plan: Reviving Punjab’s Premier Hill Station
What is the Murree Development Plan announced by CM Maryam Nawaz? The Murree Development Plan is a multi-billion-rupee comprehensive development package, described as the largest in Murree’s history. Approved during a special meeting chaired by PML-N President Nawaz Sharif and Chief Minister Maryam Nawaz, the plan includes 14 tourism schemes, healthcare facilities, water supply projects, school upgrades, sanitation schemes, and transport infrastructure including the Glass Train and Green Line buses.
7.1 What are the major projects included in the Murree Development Plan?
The Murree Development Plan is unprecedented in scale and scope, covering multiple sectors of infrastructure and public service.
Tourism infrastructure:
- New chairlift project
- Eco-friendly glamping pod village and resort
- Punjab’s first modern paragliding centre in Kotli Sattian
- Sky glass bridge for tourists
- Dedicated department for preservation of Murree’s historical and cultural buildings
- Restoration of 23 buildings and 76 shops on Mall Road completed
Healthcare facilities:
- Modern 100-bed hospital in Kotli Sattian
- 50-bed facility in Bhurban
- Nawaz Sharif Cardiology Center in Murree now operating, with cardiac surgeries to follow
Water and sanitation:
- Multi-billion-rupee water supply scheme underway
- First phase of rainwater harvesting project completed successfully
- Second phase to benefit 3,000 homes
- Sanitation scheme being introduced
7.2 What is the status of road infrastructure in Murree under the development plan?
The Murree Development Plan includes extensive road infrastructure improvements. Upgradation and repair work continues on the Patriata chairlift. Restoration of 23 buildings and 76 shops on Mall Road has been completed.
Road completion statistics:
- 70 roads in Murree and adjoining areas constructed or rehabilitated
- 120 additional roads under development in the second phase
- 37 roads completed at a cost of Rs3.98 billion
- Ten schemes under Murree Development Plan Phase-II will be completed at a cost of Rs4.66 billion
Authorities have removed illegal three-storey buildings affecting the natural landscape, including those on Mall Road, Hall Road, and Imtiaz Shaheed Road, converting the space into parks and green areas. Road expansion work has been carried out in Upper Jhika Gali following the removal of such structures.
Transport services:
- 15 new buses for tourists announced
- Green Line buses running free for students, women, and senior citizens
- Train service to be launched to reduce tourist traffic on roads
7.3 How will the Murree Development Plan transform tourism in the region?
The Murree Development Plan is designed to comprehensively enhance the visitor experience while protecting the environment. The establishment of a dedicated tourism force will enhance visitor experience. New attractions including the glass train, chairlift, paragliding centre, and sky glass bridge will provide diverse recreational options for tourists.
Environmental protections:
- Wildlife park planned to preserve Murree’s natural beauty
- Rainwater harvesting project improves water sustainability
- Removal of illegal construction protects green spaces and scenic views
- Glass train and electric buses reduce vehicular pollution
Improved infrastructure, better transport options, and new attractions are expected to significantly increase tourist traffic to Murree. This will benefit local businesses including hotels, restaurants, shops, and tour operators, while employment opportunities in hospitality, transportation, and tourism services will expand.
8. Lahore Development Plan: Urban Renewal of the Provincial Capital
What is the Lahore Development Plan announced by Maryam Nawaz? The Lahore Development Plan (LDP) is a comprehensive urban renewal and infrastructure project for the provincial capital. Phase-II of the plan aims to upgrade 6,284 streets across Lahore, with 5,798 streets under the Lahore Municipal Corporation and 486 streets under WASA. The project has been allocated significant funding and is scheduled for completion by June 30.
8.1 What is the scope of Lahore Development Plan Phase-II?
Under Phase-II of the Lahore Development Plan, a total of 6,284 streets across Lahore will be upgraded. The breakdown by jurisdiction shows:
- 5,798 streets under the Lahore Municipal Corporation (LMC)
- 486 streets under WASA
Street upgrading includes comprehensive modernization work including proper paving, drainage improvements, beautification, and infrastructure enhancements. The Chief Minister has emphasized that no compromise will be made on quality of development, and delays in completing the project will not be tolerated.
Phase-I of the Lahore Development Programme included the installation of 113 new machinery, 39 tube wells, and 10 disposal stations by WASA to improve the drainage system across the city.
8.2 What other infrastructure projects are included in the Lahore Development Plan?
Beyond street upgrading, the Lahore Development Plan includes multiple complementary infrastructure initiatives.
Water and sanitation improvements:
- WASA completed installation of 113 new machinery, 39 tube wells, and 10 disposal stations in Phase-I
- Phase-II includes upgrading 486 streets under WASA’s jurisdiction
- Water and Sanitation Agency allocated Rs204 billion in the budget to expedite development
Beautification and public space projects:
- Development of lush green belts and plantation of trees along upgraded streets
- Sustainable and eco-friendly urban environment focus
- Central Business District Punjab completed hardscaping and landscaping works along Walton Road
The Chief Minister has set a firm target to complete Phase-I of the Lahore Development Plan and has directed that all 6,284 streets be completely upgraded by the end of June.
8.3 How will the Lahore Development Plan improve quality of life in the city?
The Lahore Development Plan delivers tangible quality-of-life improvements for residents across the city.
Benefits for residents:
- Upgraded streets provide smoother, safer travel for vehicles, bicycles, and pedestrians
- Improved drainage reduces water logging during monsoon seasons
- Better street lighting and beautification enhance neighborhood aesthetics and safety
- Street upgrading typically leads to increased property values in affected neighborhoods
Better infrastructure attracts business investment, improves access to markets, and enhances the overall economic vitality of the city. The Lahore Development Plan is integrated with other major infrastructure initiatives including the Walton Road Project, SL-3 Ring Road, and Ravi Bridge expansion, creating a comprehensive urban renewal strategy for Lahore.
9. Projects in Hafizabad: Local Development for the District
What are the development projects in Hafizabad under Maryam Nawaz? The Hafizabad development package includes dedicated local development schemes featuring a newly-constructed railway bypass flyover, beautification projects, anti-encroachment drives, and the development of model bazaars. Chief Minister Maryam Nawaz has personally reviewed development progress and approved beautification projects for Hafizabad.
9.1 What is the status of the Hafizabad railway bypass flyover?
The newly-constructed flyover at the railway bypass in Hafizabad city has been opened for traffic. The flyover is expected to help with traffic flow for the city as well as neighboring districts including Gujranwala, Gujrat, Chiniot, Sargodha, and Faisalabad.
Project specifications:
- Dual carriageway flyover
- Service roads constructed along both sides
- Lights on the track to be installed soon
- Formal inauguration expected upon the Chief Minister’s next visit to Hafizabad
The project was initiated a few years ago but faced delays due to paucity of funds. It was finally completed with a Rs750 million grant by the Punjab government. Chief Minister Maryam Nawaz, on the recommendation of senior party lawmaker from Hafizabad and the district administration, ensured the provision of funds, after which work on the project was accelerated.
9.2 What beautification and urban renewal projects are planned for Hafizabad?
Chief Minister Maryam Nawaz approved beautification projects for 17 districts including Hafizabad. In Hafizabad, 73% of encroachments have been cleared, and Qainchi Road is being developed as a model bazaar.
Urban renewal projects:
- New food street development
- Public park development
- Parking area development
- Rehabilitation of eight old bazaars
- Vanike Road being developed as a model bazaar
A child protection unit has been inaugurated at Hafizabad, offering comprehensive services to children who are victims of abuse, neglect, or abandonment. Awareness campaigns in Hafizabad will promote child rights.
9.3 How does Hafizabad fit into the broader Punjab Development Programme?
Hafizabad is included in the Model Village Program under which water supply and drainage schemes will be developed in villages, dirt streets will be paved, and children’s parks will be established. Development schemes have already been approved for 414 villages, with approval for remaining plans being expedited.
The Chief Minister announced honorariums for the Deputy Commissioners of Hafizabad and Narowal for their outstanding performance in implementing development projects. The beautification projects and model bazaar development are actively underway, while the flyover is already open for traffic, providing immediate benefits to residents.
10. Walton Road Project: Major Redevelopment of Lahore’s Key Corridor
What is the Walton Road Project in Lahore? The Walton Road rehabilitation and upgrade project is a major redevelopment of the Walton Road corridor in Lahore, transforming it into a modern, three-lane dual carriageway with landscaping, footpaths, and beautification elements. The project is being executed by the Central Business District Punjab (CBD Punjab) under the direct supervision of Chief Minister Maryam Nawaz.
10.1 When was the Walton Road Project completed?
The Walton Road rehabilitation and upgrade project has been completed, with the asphalt paving of Walton Road making it fully motorable for commuters. Chief Minister Maryam Nawaz directed authorities to expedite and complete the project during her visit, ordering the three-carriageway to be opened for traffic by September with the dual carriageway completed by October.
Construction work completed:
- ADA drain construction finished
- Overhead bridge for traffic from Qainchi and Ferozepur to DHA nearing completion
- Sub-base work on Walton Road finished
- Work on water-bound layer ongoing
- Disposal stations set to become operational soon
10.2 What does the Walton Road redevelopment include?
The Walton Road redevelopment transforms the corridor into a modern transportation artery with multiple features designed to improve traffic flow and pedestrian safety.
Key features:
- Three-lane dual carriageway configuration
- Concrete footpaths for pedestrian safety
- Signboards and lane markings for improved navigation
- Hardscaping and landscaping works including lush green belts
- Plantation of trees along the corridor
The Central Business District Punjab has completed hardscaping and landscaping works along Walton Road, with ongoing horticulture efforts to enhance aesthetic appeal. Following the successful opening of the Maj Ishaq Shaheed Flyover, CBD Punjab completed the asphalt paving and has now commenced beautification works.
10.3 Who is responsible for executing the Walton Road Project?
The Central Business District Punjab (CBD Punjab) is the executing agency for the Walton Road rehabilitation and upgrade project. The CBD Punjab CEO emphasized the need to expedite the project, instructing an increase in workforce and machinery to ensure timely completion in accordance with the directives of Chief Minister Maryam Nawaz.
Chief Minister Maryam Nawaz has personally reviewed the project multiple times, making surprise visits to the Central Business District Walton project to inspect progress and urge swift completion. The authority has now commenced hardscaping and landscaping works along Walton Road following the successful completion of asphalt paving.
11. Budget and Funding for Maryam Nawaz Infrastructure Projects
How much budget is allocated for Maryam Nawaz infrastructure projects in Punjab? The Punjab government approved the province’s largest-ever development budget as part of the fiscal year financial plan, with Rs1,240 billion allocated for development — the highest in the history of Punjab. The total provincial budget stands at Rs5,335 billion, with 27% earmarked for health and education and 73% directed towards infrastructure development, service delivery, and long-term growth.
11.1 What is the breakdown of infrastructure spending in the Punjab budget?
The Punjab budget allocates substantial resources to roads, transport, and urban infrastructure. Key allocations include:
Transport and roads:
- Rs120 billion for roads
- Rs141.5 billion for transport
- Rs46 billion for the electric bus project
- Rs3.5 billion for other transport initiatives
Sector-wise allocations:
- Education: Rs811.8 billion
- Health: Rs630.5 billion
- Local government and community development: Rs411.1 billion
- Police: Rs210.1 billion
- Housing and public health engineering: Rs245.7 billion
- Agriculture: Rs129.8 billion
- Environmental protection: Rs16.6 billion
- Forests, wildlife, and fisheries: Rs36 billion
11.2 What is the budget for the Punjab Development Programme?
The Punjab Development Programme includes the construction and development of 189 cities across the province. A Project Management Unit (PMU) has been formed to ensure timely and effective execution. The program will be implemented in collaboration with international financial institutions including the World Bank and the Asian Development Bank (ADB).
Program components:
- World Bank-funded Punjab Inclusive Cities Programme (PICP): 15 cities
- ADB’s DREAMS-II project: 4 cities
- Annual Development Program (ADP) prioritized development: 11 cities
- ADP infrastructure and urban improvement: 144 cities
The “Maryam Nawaz Ka Sohna Punjab” programme has been launched in 51 cities to improve urban convenience and easy transportation. Under this program, 5,887 kilometers of sewerage lines and 181 drainage lines will be constructed across 51 cities. More than 33,000 new manhole covers will be installed, while production of high-density polyethylene (HDPE) pipes for sewerage networks is progressing at pace.
11.3 Is the Punjab budget tax-free and what does that mean for citizens?
Chief Minister Maryam Nawaz presented what she called the largest development-focused and tax-free budget in Punjab’s history, ensuring no new taxes were introduced while achieving a 47% increase in the Annual Development Programme (ADP), taking it to Rs1,240 billion.
The budget achieves increased development spending through efficient resource management, prioritization of infrastructure investment, and leveraging international financing from institutions like the World Bank and ADB. The 47% increase in ADP reflects reallocation of resources toward development rather than imposing new taxes on citizens.
Key tax-free budget features:
- 10% increase in salaries of government employees
- 5% rise in pensions
- Minimum monthly wage increased from Rs37,000 to Rs40,000
- Digital payment of all types of wages mandated
- Use of protective gear for workers and laborers mandated
12. How to Get Latest Updates and Apply for Maryam Nawaz Schemes
How can I check the latest updates on Maryam Nawaz schemes? The official Punjab government portal provides regular updates on infrastructure projects. The Punjab Chief Minister’s Office releases press statements through official news channels, and social media accounts of Chief Minister Maryam Nawaz provide real-time updates on project inaugurations and progress.
12.1 What is the official portal for CM Punjab infrastructure programs?
The Punjab government portal (punjab.gov.pk) provides official information on major infrastructure programs including the road rehabilitation program. The site reports on progress, with regular updates on kilometers completed and projects inaugurated.
Official portals:
- Punjab government: punjab.gov.pk
- Local Government and Community Development (LG&CD): lgcd punjab
- Project Management Unit (PMU) coordinates development projects across 189 cities
The PMU has been formed under the Punjab Development Programme to ensure timely and effective execution of development projects, coordinating with international financial institutions including the World Bank and the ADB.
12.2 How can I apply for Maryam Nawaz infrastructure programs?
For most infrastructure programs (roads, bridges, ring roads), no public application is required as these are government-executed projects. However, for housing schemes like the Workers Welfare Complex in Kasur, applications are being accepted for 750 residential units at the Sundar Industrial Estate, Kasur (Phase-I).
Application processes:
- Contractors can participate in tenders through the Punjab Procurement Regulatory Authority (PPRA) and respective department procurement portals
- Job opportunities are advertised through the LG&CD Punjab gov pk Jobs portal, individual department websites, and mainstream newspapers
- Digital payment of all types of wages and use of protective gear for workers and laborers has been mandated
12.3 How can I contact relevant government departments?
The Local Government and Community Development department can be contacted through the official LG&CD Punjab website. For specific inquiries, the D.G. Local Government Punjab contact number is available on the department’s official portal.
The Project Management Unit (PMU) operates under the Punjab Chief Minister’s Office. Inquiries can be directed through the Punjab government’s official communication channels or by contacting the Chief Minister’s Office.
Updates on specific projects like the Glass Train or Murree Development Plan are regularly released through official press statements and major news outlets.
13. Future Infrastructure Projects Planned by Maryam Nawaz
What are the future infrastructure projects planned by Maryam Nawaz? The Punjab government has announced several upcoming infrastructure initiatives including SL-4 Ring Road (18km, Rs45+ billion), the extension of the Glass Train from Islamabad Airport to Muzaffarabad, Phase-II of the Model Village Project transforming 7,500 villages, the Rawalpindi Ring Road completion, a fast train service from Lahore to Rawalpindi, and new electric buses for 10 additional districts.
13.1 What are the upcoming road and highway projects?
Following the construction of SL-3, the Punjab government has decided to construct SL-4, spanning approximately 18 kilometers from Multan Road to Nazir Labana (Sharaqpur) with an estimated cost exceeding Rs45 billion. The project will feature multiple interchanges and toll plazas, and is expected to be completed within two years. The Chief Minister has set a firm deadline of June 30 for accelerated progress.
Other upcoming road projects:
- Rawalpindi Ring Road: 38.6 kilometers from GT Road (Banth Mor) to Thalian Interchange, including five major interchanges
- Vehari–Multan Road: CM has ordered completion by June
- Underpasses and overhead bridges at railway crossings: Surveys ordered
The construction of 20,000 new roads is projected to benefit 50,000 families across Punjab.
13.2 What are the upcoming tourism and transport projects?
The Murree Glass Train project will be extended from Islamabad Airport to Muzaffarabad, with bidding for the monorail component starting in March. The train will operate on a 40-kilometer route from Lake View Park to Murree Bus Stand.
New transport initiatives:
- Fast train service from Lahore to Rawalpindi completing journey in 2.25 hours
- Unmanned automated systems at railway crossings to prevent accidents
- Upgrading of historic Lahore Railway Station with world-class parking and aesthetics
- Raiwind route featuring 400,000 trees to mirror European scenic rail tracks
- Electric buses for 10 additional districts of Punjab approved
- Plans for a tram service in Lahore
- Bullet train project under consideration
13.3 What are the upcoming village and urban development projects?
Punjab Chief Minister Maryam Nawaz has approved Phase-II of the Model Village (Masali Gaun) project under which 7,500 villages of the province would be transformed into model villages. Under the project, each village will be equipped with water supply system, solar-powered tube wells and drainage facilities, while wastewater ponds will be cleaned.
Project requirements:
- Clear timelines for completion to be presented
- Comparative “before and after” visual documentation of each village
- Helpline 1336 established to ensure no water filtration plant remains dysfunctional
The “Maryam Nawaz Ka Sohna Punjab” programme has been launched in 51 cities to improve urban convenience and easy transportation. Under this program, 100 kilometers of roads and streets will be paved, with priority given to sewerage systems, road rehabilitation, public safety, healthcare and other basic civic facilities.
14. Employment and Economic Impact of Maryam Nawaz Infrastructure Projects
How many jobs will Maryam Nawaz infrastructure projects create in Punjab? The Punjab government plans to construct 20,000 new roads, projected to benefit 50,000 families through direct and indirect employment opportunities. The construction of Garment City at Quaid-e-Azam Business Park Sheikhupura is expected to create significant employment in the apparel industry, while infrastructure projects across the province generate thousands of construction and operational jobs.
14.1 What types of jobs are being created by infrastructure projects?
Large-scale infrastructure projects generate employment across multiple skill levels and sectors.
Construction and engineering jobs:
- Civil engineers and project managers
- Quantity surveyors and construction workers
- Heavy machinery operators
- Electricians, plumbers, and other skilled tradespeople
The road rehabilitation program alone covers over 12,000 kilometers of roads, generating substantial construction employment. Completed projects create permanent employment in operations and maintenance. The Glass Train will require train operators, station staff, maintenance crews, and tourism support staff. The Garment City will create manufacturing jobs. Improved roads and connectivity facilitate business growth, leading to long-term job creation.
Indirect employment:
- Material supply and transportation
- Hospitality and retail
- Services sector expansion
- Agricultural market access
14.2 What is the broader economic impact of Maryam Nawaz infrastructure projects?
Better roads reduce transportation costs, improve supply chain efficiency, and facilitate trade. The SL-3 Ring Road and Motorway Interchange Sheikhupura improve connectivity for businesses. The Garment City initiative aims to make Punjab a hub for the apparel industry, boosting exports. The Murree Development Plan enhances tourism revenue.
Quality-of-life improvements:
- Reduced travel time saves commuters hours each week
- Better roads lower vehicle maintenance costs
- Improved drainage reduces flooding during monsoons
- Enhanced public transport options including Glass Train and Green Line buses provide affordable mobility
- Access to markets, schools, and healthcare improves with better connectivity
Major infrastructure projects typically increase property values in surrounding areas. The SL-3 Ring Road has already spurred real estate development along its route, while the Walton Road redevelopment has enhanced property values in the Central Business District area.
Disclaimer
The information provided in this guide is based on official government announcements, press releases, and verified news reports. Infrastructure project timelines, budgets, and statuses are subject to change as work progresses. Readers are encouraged to verify specific details through official Punjab government portals for the most current information.
Frequently Asked Questions (FAQs)
Q1: What are all the infrastructure schemes launched by Maryam Nawaz in Punjab?
The Maryam Nawaz infrastructure schemes include the Sarkain Bahal Punjab Khushal program (Rs100 billion), SL-3 Ring Road Southern Loop, SL-4 Ring Road (approved), Ravi Bridge Upgradation, Tourist Glass Train, 43 Development Schemes for Kasur, Motorway Interchange Sheikhupura, Murree Development Plan, Lahore Development Plan (6,284 streets), Projects in Hafizabad, and Walton Road Project.
Q2: How many infrastructure projects has Maryam Nawaz announced so far?
Maryam Nawaz has approved over 20,000 new roads and rehabilitation projects across Punjab, with work actively underway on 462 roads. The Sarkain Bahal Punjab Khushal program alone covers 12,000+ kilometers of road construction and rehabilitation.
Q3: When will the SL-3 Ring Road Southern Loop be completed?
The SL-3 Ring Road Southern Loop has been completed and was opened to the public in early 2024 after 12 years of delays. The project cost approximately Rs16.5 billion and spans 18.5 kilometers from Raiwind Road to Multan Road.
Q4: What is the Tourist Glass Train project in Punjab?
The Tourist Glass Train is a scenic electric rail service operating on a 40-kilometer route from Lake View Park in Islamabad to Murree Bus Stand. The project has secured PC-I approval, with bidding scheduled for March. Tickets are priced at Rs500 for standard and Rs1,000 for premium. The route will be extended from Islamabad Airport to Muzaffarabad.
Q5: How many development schemes are planned for Kasur under Maryam Nawaz?
A total of 43 development schemes have been approved for Kasur district, including 1,220 industrial worker housing units, a Workers Welfare Complex with 750 flats, a technology university, a 300-acre industrial and technology park, Garment Cities project, and innovative mobile learning projects (School on Wheels and Library on Wheels).
Q6: How much budget is allocated for Maryam Nawaz infrastructure projects?
The Punjab development budget stands at Rs1,240 billion — the largest in the province’s history. Key allocations include Rs120 billion for roads, Rs141.5 billion for transport, Rs46 billion for the electric bus project, and Rs204 billion for the Water & Sanitation Agency.
Q7: What is the Model Village Project Phase-II?
Phase-II of the Model Village Project will transform 7,500 villages across Punjab into model villages, equipping each with water supply systems, solar-powered tube wells, drainage facilities, and cleaned wastewater ponds. Phase-I includes 485 villages at a cost exceeding Rs59 billion.

Add a Comment